Chine (Rép. pop) Divers
Divers

Tool Building

Prix : 1 000,00 €

As a good reputation manufacturer in China, we here share the basic injection mold making process in our company:

  1. Products design department provides product information to injection mold design department, injection mold designers complete cost analysis in two working days, and provide to R&D manager.
  2. R&D department release "Mold Making Apply" to plastic injection mold design department after confirming the project.
  3. Injection mold designers organize relevant personnel to review the project based on the product information, including product structure, mold structure, cooling system, runner, slag, venting, etc. in plastic injection molding process
  4. After evaluation, injection mold designers begin to design the plastic injection mold, including 3D drawing correction, 3D parting, mold parts assembly drawing, EDM drawing, electrode drawing etc., and organize relevant personnel to evaluate those drawings, then issue to plastic injection mold making department.
  5. Injection mold makers evaluate and study the drawings, and order mold materials if there is no objection, otherwise, communicate with the plastic injection mold designers.
  6. Injection mold makers inspect the mold materials in time after the materials arrive to injection mold factory china, and arrange technicians to do locksmith works, including turning, grinding, milling, screw holes, water carrying hole, center hole, CNC roughing, etc. The technicians should pay attention to the precision of each right-angle sides, avoid empty of the center hole and each production base, roughing margin etc. Then outsource each mold part to heat treatment promptly.
  7. After heat processing, plastic injection mold maker must detect its hardness and metallurgical analysis. Generally, the core hardness 46-50HRC, for uniform distribution of 9 points, requiring its hardness differ is less than 2HRC. Metallurgical analysis should be done for the injection mold core prior to processing to make sure there is no segregation, scars, etc.
  8. Electrode processing, there are fine and rough processing, fine male spark is 0.05-0.08, rough male spark is 0.2-0.3 (subject to the actual situation). Be sure to pay attention to each processing benchmarks, and detect electrodes after processing finished.
  9. Before finishing, must make right angle for the mold core, the vertical degree should less than 0.02 mm, finish degree 1.6.
  10. For line cutting, please note that all parts' base, enlarge 0.02mm for the insert hole and center hole as tolerance clearance, for non-standard thimble, the tolerance clearance is 0.04mm of the actual thimble size.
  11. Mold core finishing, based on the benchmarks after making right-angles, typically leaves 0.02 mm die as a margin (without considering tool wearing).
  12. EDM processing, process according to the drawings' size, fine 0.05-0.08, rough 0.2-0.3 (subject to the actual situation), pay attention to the benchmarks in processing, for sparks processing, the leave a margin of 0.03-0.05 mm.
  13. The runner surface must be polished to achieve Ra6 or Ra7 finishing, the surface does not allow spark or knife pattern to exist.
  14. Before assembling the plastic injection molding parts, the mold maker must do a comprehensive inspection for all related parts to make sure everything is in a good condition, and do cleaning and anti-rust treatment. Then fill "Mold Inspection Summary" form.
  15. In tryout, injection mold designers, plastic mold makers and die casting workshop personnel should go to the site, making analysis and solution of abnormal in casting tryout, improving the plastic injection mold and die casting process according to the results, and fill "Mold Tryout Report".
  16. By 100-150 cycle time, the tryout products are defect-free, the production department make production schedule, the technicians track the production processes, and feedback yield to the plastic injection mold making department.
  17. After tryout, plastic injection mold making department apply for storage with the forms of "Mold Making Apply" and "Mold Making Inspection".

We are ready and looking forward to cooperate with your next project, Contact Us Now, you will be satisfied to choose us as your partner in plastic parts manufacturing process.

We are one of the professional plastic moulded products manufacturers,we provide injection mold building,injection mold tooling china and cheap injection molding,you can see injection molding tooling cost in our website.

Localisation : Building BA106,No.4 Zhenrong Road,6th lndustrial Area,Caiwu Village,Wusha Communitv,Chang'an Town,Dongguan City China, 523857 Chang'an,
Personne à contacter : Lu Cally , 86 0769 82926607

Bonne affaire : acheter au vendeur

Consultez notre guide pour effectuer une transaction en toute sécurité ! En aucun cas Algomtl ne peut être tenu responsable des annonces publiées. Seule la responsabilité du vendeur ou de l'acheteur en cas de litige est engagée.
Nous vous invitons à lire nos conditions générales d'utilisations. Vous pouvez aussi vous rendre sur nos FAQ et consulter notre page d'informations sur les risques liés à la contrefaçon.
Cette page concerne les importateurs et exportateurs de
Tool Building

Rechercher dans la catégorie : Divers
Rechercher dans la catégorie :
tool, building
Vietnam 700000 Meubles
Imitation Rattan chair - QP 254

Vendredi 15 novembre 2024

Quantité : 720

PLASTIC IMITATION RATTAN CHAIR Aluminium chair with rattan strings. Solid and stable frame in imitation of bamboo (aluminum tube with wall thickness 2 mm) and rattan seat (artificial rattan headed inside hardened steel wire). Model: Rattan. Material: PP. Usage: Interior/out door...

Qui Phuc Company Limited

  • Luck06
  • 700000 - Ho Chi Minh
  • +84 9 86 58 28 62
Pneumatic Hot Foil Date Coding Machine

Mardi 19 novembre 2024

- Pneumatic Hot Foil Date Coding Machine - Model No.: PE-200 The essential characters of Pneumatic Hot Foil Date Coding Machine PE-200 are high speed ( up to 120 prints/min ), small volume and can be easily installed on VFFS and intermittent packaging machines. It is for coding...

Autopack Co.,Ltd

Hong Kong 523929 Biens d'équipement
China Rooman Home Air Purifier AC300

Vendredi 14 août 2015

Quantité : 200 at lea - Prix : To be discussed

Key Specification: - Color: Various color can be chosed - Input Voltage: 120~240V - Rated Power: 50-60HZ - Power (W): 36~55W - Noise Level: 25~55dB - Display Mode:LED - Control Mode: Touch screen - CADR: 320m³/H - Purifying Rate: 99.7% - Length Of Power Cord: 2...

Rooman Electrical Appliances Co., Ltd.

  • Rooman1
  • 523929 - Dongguan
  • +13 6 62 88 32 70