Geocell
hdpe geocell, geocell geoweb,geocell used in road construction,perforated geocell,Smooth geocell ,ge ocell web,textured geocell,geocell slope erosion control,erosion control geocell,geocell retaining,s mooth geocells,geocell for retaining walls,reinforcement geocell,honeycomb geocell
Plastic geocell,reinforced geocell,geocell for retaining wall,hdpe geocell,ultrasonic welding geocel l,geocell used in road construction,Nonwoven Geocell Fabric, Geosynthetics Geocell
Specification
Material HDPE,LDPE,PP
Surface Smooth , Textured
Hole Holes or without hole
Length 50m/roll (at request)
Color Black , Green
Certification CE/ISO9001-2008
Manufacturing method Ultrasonic Welding
Function High Stability,creep resistant
Geocell made of PE or PP sheets through High intensity ultrasonic welding to be three-dimensional ne t structure material.
It uses local materials (sand, gravel, mud, etc.) as a filler material to be a combination of the st eady structurel,achieve a high load carrying capacity.can make roadbed more steady, but also can pla nt on it, green the slope stability.
Geocell mainly divided into smooth surface geocell , textured surface geocell , with holes or not.</ p>
PP geocell , HDPE geocell etc.
Geocell Applying Area
1.Be used for firm the roadbed of railroad;
2.Be used for firm highway soft foundation handling;
3.Be used for dike and retaining wall, which can bear load force;
4.Be used to harness the shoal water runway;
5.As pipeline and the sewer's propping up structure;
6.Be used fo5r mixed type retaining wall that prevent the slope from falling down and bear load forc e;
7.Be used for independent wall, dock and breakwater;
8.Be used to harness the desert, beach and riverbed ,river bank
Geocell Features
light weight, abrasion resistance, chemical stability, light oxidative aging, acid, suitable for dif ferent soil and desert soil conditions.
Construction Method
1.Unfolding the geogrid (Some fiber-material can be put under the geogrid according to the concrete condition,for example geotextile and felted cushion.)
2.Fixing it with nail or connecting with the frame of stretcher;
3.Used loader to fill with filler until it is full top and beyond of the geogrid, then through vibra tion
and rolling, the subbase is completed
4.By now, the system of geogrid can prop up kinds of construction equipment, and that construction d irectly above it is accepted, together with conventional manner surface
Localisation : A-708,Yihong Building ,No.298 Zhonghua North Street, Xinhua , 050000 Shijiazhuang,
Personne à contacter : Lucy Chai, 80690567